The working bee for Loftus Oval will be on 15th March between 9 am and 1 pm.
Working Bee – Task List
⚽ Goal Setup
1. Assemble 6 new aluminium goals (on wheels)
- Allow 2 people per goal
- Tools required:
- 5mm Allen key
- Shifting spanner
- Goals will include small Allen keys, but they are basic throwaways.
- If you have a 5mm T-bar Allen key, please bring it along.
Assembly Video:
https://youtu.be/Brmww62teoQ
2. Secure new goals
- Install chains and padlocks to lock up the new goals.
3. Fit nets to the main field goals
- Goals must be set up on the field first.
- Use ratchet tie-downs to secure the bottom of the nets.
Field & Grounds Work
4. Mark and paint field lines
- Use string lines
- 3 people required
5. Remove weeds from the goal cage
- Bring gloves and rakes
6. Whipper snip drainage outlets
- Locations:
- Entrance to the goal cage
- SE corner of the field
- See the white-marked tree for the drain location
- Please bring a whipper snipper
7. Prepare cricket pitch stump holes
- Dig out holes
- Install artificial turf inserts
- Mow the grass edge around the cricket pitch
🧹 Clubhouse & Storage Areas
8. Sweep out the gear shed
9. General clubhouse clean up
10. Clean canteen cupboards
11. Clean and wipe out fridges
12. Wipe down bench tops
13. Seal tile/bench joint with silicon
14. Tidy the store room
15. Mop canteen and store room floors
16. Tidy the control room
17. Organise gear cupboards
18. Mop toilets
🧼 Deep Cleaning The Club Room
19. Remove all gear from the club room
20. Pressure wash club room floors (John and Barry to coordinate)
22. Pressure wash grandstands and BBQ area
23. Put all the gear back into the club room
🍖 BBQ Area
23. Clean BBQ
- Check lighting switches and burners
- Clean the BBQ fridge and BBQ area
24. Hang 2025 Premiership Team Photos
Tools required:
- Hammer drill
- Wall plugs
- Screws
- Hooks
- Drill bits
- Screwdrivers